EMPLOYER: ROBERT E LAMB, INC. 

PROJECT: WYETH COMPOUNDING SHUT DOWN, CHERRY HILL, NJ 

SCOPE $5M 10 DAY MFG SHUT DOWN FDA RENOVATION TO ISOLATE FORMULATING PROCESSES; EPOXY 

TERRAZZO, CLEAN ROOM VALIDATED HVAC, WFI, METTLER TOLEDO PRODUCT SCALES 

MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER 



EMPLOYER: ROBERT E LAMB, INC. 

PROJECT: METROMEDIA FIBER NETWORK COLOCATION FACILITY 

SCOPE $15M WILMINGTON DE CoLo UPFIT 

DOWNTOWN 56 STORY GENERATOR CRANE RIG,  12kV VOLTAGE HOT STICKS MEASUREMENT, NEW 12kV - 480/277 GEAR, 48V XFMR, RECTIFIER, BATTERY STRINGS, UPS, EQUIPMENT RACKS, CABLE TRAY / DC POWER CABLING, LIEBERT AC / CHw EVAPORATORS 

MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER 





EMPLOYER: ROBERT E LAMB, INC. 

PROJECT: METROMEDIA FIBER NETWORK BALTIMORE 

SCOPE $5M SIGNAL REGENERATION FACILITY DOWNTOWN ON CSX RIGHT OF WAY 150T CRANE RIG, UPS, 

GENERATOR, ATS & MTS, NEW UTILITY (POWER) 

SERVICE, LIEBERT AC WITH CHILLED WATER LOOP 

MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER 



EMPLOYER: ROBERT E LAMB, INC. 

PROJECT: MERCK WEST POINT PA DATA CENTER 

SCOPE $5M RAISED FLOOR, RECTIFIERS, FM 200 FIRE SUPRESSION, UPS, BATTERY STRINGS, GENERATOR, DC POWER, CABLE TRAY AND EQUIPMENT RACKS, LIEBERT AC, CONCRETE 

ENCASED ELECTRICAL DUCTBANK 

MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER / SUPT 



EMPLOYER: ROBERT E LAMB, INC. 

PROJECT: PACIFIC GAS & ELECTRIC BAY AREA CONTROL CENTERS 

SCOPE 7 NEW BAY AREA FACILITIES 36mo PLANNED 

POWER GRID MONITORING / CONTROL CENTERS SUBSEQUENT ENRON EVENTS; ALL TRADES. CONCORD CA FACILITY STARTED, STOPPED. 

MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER / SITE SUPERINTENDENT