WE ARE PENN STATE
MEP SUPERINTENDENT, HARRAH'S SAN DIEGO

ELECTRICAL WORK EXPERIENCE

installation & supervisory experience
union & open-shop
hobbies and interests

EMPLOYER: KVAERNER 

PROJECT: KVAERNER PHILADELPHIA SHIPYARD 

SCOPE $16M ELECTRICAL WORK ON 24mo. $500M OCEAN 

CONTAINER / TANKER FACILITY IN DRYDOCKS 

4 AND 5; DEMOLITION, 13.2KV DISTRIBUTION, 2300V AIR COMPRESSOR AND LOOP, (8) 13.2kV - 480V SUBSTATIONS, LIGHTNING PROTECTION, FIRE ALARM, VIDEO, SECURITY, ACCESS CONTROL, VOICE/DATA, HI BAY METAL HALIDE LIGHTING, 480V BUSWAY, DRYDOCK UTILITY TUNNEL CABLE TRAY & CORING 

MY ROLE: KVAERNER (CM) PROJECT ENGINEER: SCOPE OF WORK DEFINITION FOR BIDS, RFIs, SUBMITTALS, COORDINATION MEETINGS, CHANGE ORDER AND INVOICE APPROVAL 

ELECTRICAL PROJECT ENGINEER, $16M ELECTRICAL WORK PACKAGE ON $500M PHILADELPHIA SHIPYARD CONSTRUCTION PROJECT
iGoogle
'Home' tab has been sent.     CloseSending failed. Please try again in a few minutes.     CloseThe 'GADGET_NAME' gadget has been sent.     Close
You have been signed out. Sign in to see your stuff.
(Don't have an iGoogle page? Get started.)
OVER 30 YEARS AGO I began my construction career installing industrial and commercial electrical systems for my father's design build electrical contracting business.  Over these years I have had the great fortune to have my father's education, training and experience as a P.E/ EE available to me as a resource.  My father continues to create MEP designs for construction projects from his Clayton, NC office, and the experience I have over the years and his help in learning have provided me solid skills and lessons to draw from

EMPLOYER: ROBERT E LAMB, INC. 

PROJECT: WYETH COMPOUNDING SHUT DOWN, CHERRY HILL, NJ 

SCOPE $5M 10 DAY MFG SHUT DOWN FDA RENOVATION TO ISOLATE FORMULATING PROCESSES; EPOXY 

TERRAZZO, CLEAN ROOM VALIDATED HVAC, WFI, METTLER TOLEDO PRODUCT SCALES 

MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER 



EMPLOYER: ROBERT E LAMB, INC. 

PROJECT: METROMEDIA FIBER NETWORK COLOCATION FACILITY 

SCOPE $15M WILMINGTON DE CoLo UPFIT 

DOWNTOWN 56 STORY GENERATOR CRANE RIG,  12kV VOLTAGE HOT STICKS MEASUREMENT, NEW 12kV - 480/277 GEAR, 48V XFMR, RECTIFIER, BATTERY STRINGS, UPS, EQUIPMENT RACKS, CABLE TRAY / DC POWER CABLING, LIEBERT AC / CHw EVAPORATORS 

MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER 





EMPLOYER: ROBERT E LAMB, INC. 

PROJECT: METROMEDIA FIBER NETWORK BALTIMORE 

SCOPE $5M SIGNAL REGENERATION FACILITY DOWNTOWN ON CSX RIGHT OF WAY 150T CRANE RIG, UPS, 

GENERATOR, ATS & MTS, NEW UTILITY (POWER) 

SERVICE, LIEBERT AC WITH CHILLED WATER LOOP 

MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER 



EMPLOYER: ROBERT E LAMB, INC. 

PROJECT: MERCK WEST POINT PA DATA CENTER 

SCOPE $5M RAISED FLOOR, RECTIFIERS, FM 200 FIRE SUPRESSION, UPS, BATTERY STRINGS, GENERATOR, DC POWER, CABLE TRAY AND EQUIPMENT RACKS, LIEBERT AC, CONCRETE 

ENCASED ELECTRICAL DUCTBANK 

MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER / SUPT 



EMPLOYER: ROBERT E LAMB, INC. 

PROJECT: PACIFIC GAS & ELECTRIC BAY AREA CONTROL CENTERS 

SCOPE 7 NEW BAY AREA FACILITIES 36mo PLANNED 

POWER GRID MONITORING / CONTROL CENTERS SUBSEQUENT ENRON EVENTS; ALL TRADES. CONCORD CA FACILITY STARTED, STOPPED. 

MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER / SITE SUPERINTENDENT