PROJECT: KVAERNER PHILADELPHIA SHIPYARD
SCOPE $16M ELECTRICAL WORK ON 24mo. $500M OCEAN
CONTAINER  / TANKER  FACILITY  IN DRYDOCKS
4 AND 5;  DEMOLITION, 13.2KV DISTRIBUTION, 2300V
AIR COMPRESSOR AND LOOP, (8) 13.2kV - 480V SUBSTATIONS
LIGHTNING PROTECTION, FIRE ALARM, VIDEO, SECURITY 
ACCESS, VOICE/DATA, HI BAY  METAL HALIDE LIGHTING
MY ROLE: KVAERNER (CM) PROJECT ENGINEER:  SCOPE OF WORK
DEFINITION FOR BIDS, RFIs, SUBMITTALS, COORDINATION
MEETINGS, CHANGE ORDER AND INVOICE APPROVAL

PROJECT: ROBERT E LAMB WYETH COMPOUNDING CLEAN  ROOM SHUT DOWN
SCOPE $5M 10 DAY MFG SHUT DOWN FDA RENOVATION TO
ISOLATE FORMULATING PROCESSES; EPOXY
TERRAZZO, CLEAN ROOM VALIDATED HVAC, WFI, SCALES
MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER


PROJECT: ROBERT E LAMB METROMEDIA FIBER NETWORK
SCOPE $15M WILMINGTON DE CoLo UPFIT
DOWNTOWN 56 STORY GENERATOR CRANE RIG,
12kV VOLTAGE HOT STICKS MEASUREMENT, NEW
12kV - 480/277 GEAR, 48V XFMR, RECTIFIER, BATTERY
STRINGS, UPS, EQUIPMENT RACKS, CABLE TRAY / DC
POWER CABLING, LIEBERT AC / CHw EVAPORATORS
MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER

PROJECT: ROBERT E LAMB METROMEDIA FIBER NETWORK BALTIMORE
SCOPE $5M SIGNAL REGENERATION FACILITY DOWNTOWN ON
CSX RIGHT OF WAY 150T CRANE RIG
UPS, GENERATOR, ATS & MTS, NEW UTILITY
(POWER) SERVICE, LIEBERT AC
MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER


PROJECT: ROBERT E LAMB MERCK WEST POINT PA DATA CENTER
SCOPE $5M RAISED FLOOR, RECTIFIERS, FM 200, UPS,
BATTERY STRINGS, GENERATOR, DC POWER
CABLE TRAY AND EQUIPMENT RACKS, LIEBERT AC
MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER / SUPT

PROJECT: ROBERT E LAMB PACIFIC GAS & ELECTRIC BAY AREA CONTROL CENTERS
SCOPE 7 NEW BAY AREA FACILITIES 36mo CANCELLED BUDGET
POWER GRID MONITORING / CONTROL CENTERS
SUBSEQUENT ENRON EVENTS; ALL TRADES. CONCORD
CA FACILITY STARTED, STOPPED.
MY ROLE: ROBERT E. LAMB (CM) PROJECT MANAGER / SITE SUPT


PROJECT: SHAMES HOME DEPOT BRENTWOOD CA
SCOPE $11M 100kSF STORE & 12 ACRES SITE WORK
LASER SCREED SLAB TILT-UP WALLS, SEISMIC ZONE
DIAPHRAGM ROOF STRUCTURE, ALL TRADES 4 mo
3rd PARTY ROOF, PAINT, WELDING, (EXPANSIVE) SOILS
AND CONCRETE TESTING, RETAINING WALLS, UG UTILS
MY ROLE: SHAMES CONSTRUCTION (GC) SUPERINTENDENT


PROJECT: W.E. O'NEIL HARRAHS SAN DIEGO
SCOPE EXTENSIVE TEMPORARY FACILITIES AND CASINO
PATRON ACCOMODATIONS FOR EXISTING
FACILITY DURING $165M DEMOLITION, PILES,
CASINO EXPANSION, 21 STORY HOTEL, WWTP,
EXTENSIVE ADA / LIFE SAFETY / SMOKE-FIRE
DAMPERS, EMERGENCY LIGHTING / DOOR INTER-
LOCKS, FIRE SUPRESSION SYSTEMS
PARKING STRUCTURE, 300 ACRE SITE WORK, 12 mo
MY ROLE: MEP PROJECT ENGINEER / SUPT
$30M MEP WORK 6 DAYS * 12 HOURS

PROJECT: YONKERS BAYER CLAYTON NC
SCOPE $5M HAZARDOUS MATERIALS TRANSFER FACILITY
ALL TRADES, 100% OUTSIDE AIR/ CONTAINMENT
MY ROLE: YONKERS (CM) CONSTRUCTION MANAGER


PROJECT: YONKERS WYETH SANFORD NC
SCOPE $10M COMPOUNDING RENOVATIONS ALL TRADES
FUEL STORAGE TANK, CONTAINMENT, CIRCULATING
PUMP AND LOOP, DELTA V CONTROLS
MY ROLE: YONKERS (CM) CONSTRUCTION MANAGER

PROJECT: YONKERS NOVO NORDISK CLAYTON NC
SCOPE $15M PACKAGING CLEAN ROOM UPFIT
ALL TRADES, NEW MEZZANINE, AHU,
OVERHEAD DOORS, JOHNSON CONTROLS
MY ROLE: YONKERS (CM) CONSTRUCTION MANAGER


PROJECT: YONKERS GSK ZEBULON NC
SCOPE $10M BIRD FLU CLEAN ROOM PACKAGING FACILITY
VALIDATED DEMOLITION / RECONFIGURATION OF
SHARED ADVAIR HVAC, EPOXY TERRAZZO, WALL /
CEILING PANELS, JOHNSON CONTROLS, FINISHES
MY ROLE: YONKERS (CM) CONSTRUCTION MANAGER

PROJECT: YONKERS HOSPIRA ROCKY MOUNT NC
SCOPE $10M ALL TRADES DEMOLITION & PACKAGING
UPGRADES: WFI, CLEAN ROOMS, VALIDATED
JOHNSON CONTROLS / WFI STORAGE UPGRADES
MY ROLE: YONKERS (CM) CONSTRUCTION MANAGER
REPRESENTED HOSPIRA, MANAGED GC

PROJECT: YONKERS MERCK VMF 102 DURHAM NC VACCINES MFG
SCOPE NEW STEEL STRUCTURE & PHARMADULE MODULAR
CLEAN ROOM SYSTEM VACCINES PLANT
$100M 24 MONTH ALL TRADES DELTA-V CONTROLS
MY ROLE: YONKERS (CM) CONSTRUCTION MANAGER
SITEWORK / CONCRETE / STEEL / FINISHES


PROJECT: YONKERS BD WILSON NC
SCOPE CNEW MANUFACTURING / WAREHOUSE / LAB / OFFICE
$150M 24 MONTH ALL TRADES, CLEAN ROOMS, DEA
SPEC WAREHOUSE, LABS, OFFICES, PACKAGING
MY ROLE: YONKERS (CM) CONSTRUCTION MANAGER ALL TRADES

PROJECT: KEYSTONE PIEDMONT NATURAL GAS NASHVILLE TN LNG
SCOPE PLANT UPGRADES $15M VAPORIZORS, BOILERS, ADSORBERS,
REGEN HEATER, PURIFICATION,
AIR COMPRESSORS, SITE WORK, SQUARE D DDC
PLC & EMERSON FISHER PNEUMATIC CONTROLS
MY ROLE: AGENCY CM REPLACING DEFECTIVE WORK
ADVISING PNG WHILE LEGAL CASE ONGOING PREVIOUS GC

PROJECT: KEYSTONE BIOGEN-IDEC RTP INFOR EAM MAINTENANCE SYSTEM
SCOPE PROCEDURAL PROCESS IMPROVEMENTS, FERMENTATION / CIP
MY ROLE: KEYSTONE AGENCY CM ON SITE PROCESS OWNER REQUIREMENTS
GATHERING, PROGRESS MEETINGS, REPORTING


PROJECT: MALINKRODT RALEIGH IBM MAXIMO MAINTENANCE SYSTEM
SCOPE PROCEDURAL PROCESS IMPROVEMENTS, API BULK MFG
MY ROLE: KEYSTONE AGENCY CM ON SITE: REQUIREMENTS, REPORTING